Skip to content
Photonews Logo Photonews logo
  • Home
  • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Azad Jammu Kashmir
    • Balochistan
    • Gilgit – Baltistan
  • World
  • Business
  • Entertainment
  • Videos
    Shakira Dai Dai's Song For World Cup 2026
    Videos

    Shakira Dai Dai Song Released For World Cup 2026

    May 24, 2026 2 Min Read
    Dua Lipa Live From Mexico on YouTube
    Videos

    Dua Lipa Live From Mexico Film Arrives on YouTube

    May 22, 2026 1 Min Read
    Shakira 2026 World Cup anthem
    Videos

    Shakira 2026 World Cup Anthem “Dai Dai” Featuring Burna Boy Unveiled

    May 8, 2026 2 Min Read
  • Sports
  • Technology
  • Offbeat
  • Blog
  • Contact
Reading: World bank approves $188 for refurbishing of Guddu barrage
PhotoNews PakistanPhotoNews Pakistan
Font ResizerAa
Search
  • Home
  • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Balochistan
    • Azad Jammu Kashmir
    • Gilgit – Baltistan
  • World
  • Business
  • Entertainment
  • Videos
  • Sports
  • Technology
  • Offbeat
  • Blog
  • Contact
Have an existing account? Sign In
Follow US
© 2022 Photonews. All Rights Reserved.
PhotoNews Pakistan > Sindh > World bank approves $188 for refurbishing of Guddu barrage
Sindh

World bank approves $188 for refurbishing of Guddu barrage

Web Desk
By Web Desk Published June 20, 2015 5 Min Read
Share
SHARE

The World Bank has approved an estimated $188 million loan for Pakistan to improve the reliability and safety of  Guddu barrage, which will extend the life of the project by another 50 years.

The Washington-based lending agency approved the loan under its Sindh Barrages Improvement Project aimed at rehabilitating the deteriorated infrastructure of the Guddu barrage. The country plans to invest a total $208 million on this project and remaining $20 million will be arranged by mobilizing domestic resources.

The credit is financed from the International Development Association (IDA), the World Bank Group’s grant and low-interest arm. It will be on standard IDA terms, with a maturity of 25 years, including a grace period of 5 years.

The rehabilitation work of Guddu barrage will eliminate possible sources of failure and potentially give the structure another 50 years of life, according to a handout issued by the WB’s country office on Saturday.

To close the gap between water supply and water demand, Pakistan is placing emphasis on modernising its ageing hydraulic infrastructure and improving water resources management. The water sector will remain a critical contributor to sustained economic development.

According to the statistics compiled by the WB, Pakistan’s irrigation and drainage system has a total investment value of around $300 billion. Nearly 43% of the population gains employment from this system and it accounts for approximately $16 billion or one-fourth of the Gross Domestic Product (GDP).

It said due to the country’s arid climate, high susceptibility to droughts agriculture in Pakistan is predominantly irrigated, and adequate irrigation infrastructure is critical. Sindh Province, in particular, contributes 23% to the agricultural sector and has high potential for further productive development.

The primary function of the gated Guddu barrage is to service the irrigation of over one million hectare of agricultural land by feeding the Beghari Sindh Feeder and the Desert Pat Feeder main canals on the right side of the river and the Ghotki Feeder on the left side. The barrage is also used for river control and flood management. It is also an important transport link across the Indus River and provides cooling water for the thermal power station at Guddu.

The continued operation and management of barrages require specialized expertise, experience, decision making, and continuity of the operation, said Rachid Benmessaoud, the World Bank Country Director for Pakistan.

He said in addition to physical rehabilitation of barrage infrastructure, the project will also support the Sindh Government in training and technical assistance in procurement, financial, social and environmental safeguards for operating hydraulic irrigation infrastructure.

The project will support the gate replacement work to improve the regulation and the flow of the barrage. All the 65 main barrage steel gates, 25 main canal head regulator gates, and hoist gears including all mechanical and electrical equipment will be replaced.

This project will also finance the independent Panel of Experts, who will review, monitor, evaluate, and help guide the rehabilitation process with regards to the safety of the barrage.

The effective operation and structural stability of the Guddu barrage are important for agricultural production and for averting potential disaster during floods, said Abdulhamid Azad, the task team leader of the project.

The primary beneficiaries of the project are over 2.6 million people of irrigated land in Kashmore, Ghotki, Jacobabad, Sukkur, and Shikarpur districts of Sindh, and Nasirabad and Jafarabad districts of Balochistan, who will receive reliable supply of water.

The improved structure will mitigate the impact of floods and reduce risks of embankment breaches; since the capacity of the barrage to pass flood waters will also greatly improve.

Also read:‘Sindh must spend more on development’
Share This Article
Facebook Twitter Pinterest Whatsapp Whatsapp LinkedIn Email Copy Link Print
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Advertisement

Recent Posts

Cybersecurity graphic showing a laptop phishing login screen with FBI warning and Microsoft 365 app icons.

Kali365 Phishing Scam Targets Microsoft 365 Users

collage showing Matthew Perry and Kenneth Iwamasa side by side.

Matthew Perry Assistant Gets 41 Months in Case

2026 World Cup ticket prices

World Cup Ticket Prices Face NY, NJ FIFA Probe

Post Archives

More Popular from Photonews

Tiger Woods wearing a red polo shirt on a blurred green golf course background. Image Credit: Getty Images
Sports

Tiger Woods Majors Absence Set To Continue In 2026

1 Min Read
Rows of Iranian drones are shown on stands with Iranian flags displayed in the background.
World

Iran Drone Production Restarts During Ceasefire

1 Min Read
Several U.S. MQ-9 Reaper drones sit in a military hangar while personnel inspect and maintain the aircraft.
World

MQ-9 Reaper Iran Strikes Led US Air Campaign

2 Min Read
World

Israel Settlement Expansion Draws European Warning

Israel settlement expansion drew a joint warning Friday from Italy, France, the United Kingdom and Germany,…

May 23, 2026
Tech

Nokia AI Stock Surges 140% On Infrastructure Bet

Nokia AI stock has surged 140% year to date, reaching a 52-week high of 15.78 in…

May 27, 2026
Tech

AI Internet Changes Push Google To Redesign Search

Google is redesigning Search as AI internet changes reshape how people ask questions, shop online and…

May 24, 2026
Top NewsWorld

US Iran Deal Talks Near Draft Framework

United States, Washington: The United States and Iran are nearing a draft framework that could extend…

May 24, 2026
PhotoNews Pakistan

Always Stay Up to Date

Subscribe to our newsletter to get our newest articles instantly!

    Categories

    • World
    • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Balochistan
    • Azad Jammu Kashmir

     

    • Top News
    • Business
    • Entertainment
    • Sports
    • Videos
    • Tech
    • Offbeat
    • Blog
    • About Us
    • Privacy Policy
    • Code of Ethics & Editorial Standards

    © 2026 Phototnews
    All Rights Reserved.

    Welcome Back!

    Sign in to your account

    Lost your password?