Skip to content
Photonews Logo Photonews logo
  • Home
  • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Azad Jammu Kashmir
    • Balochistan
    • Gilgit – Baltistan
  • World
  • Business
  • Entertainment
  • Videos
    Angry Birds Movie 3 trailer by Paramount animated sequel before December 2026 release
    Videos

    Angry Birds Movie 3 Trailer Sets Dec 23 Release

    June 30, 2026 1 Min Read
    Olivia Wilde Trailer Gregg Araki Thriller I Want Your Sex Trailer Shows Olivia
    Videos

    Olivia Wilde Trailer Shows Gregg Araki Thriller I Want Your Sex Trailer Shows Olivia

    June 11, 2026 1 Min Read
    Alia Bhatt Alpha teaser shows the actor entering action mode in YRF’s female-led spy thriller.
    Videos

    Alia Bhatt Alpha Teaser Shows Bobby Deol Training Her

    June 10, 2026 1 Min Read
  • Sports
  • Technology
  • Offbeat
  • Blog
  • Contact
Reading: Khaqan Abbasi offers himself for trial if corruption unearthed
PhotoNews PakistanPhotoNews Pakistan
Font ResizerAa
Search
  • Home
  • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Balochistan
    • Azad Jammu Kashmir
    • Gilgit – Baltistan
  • World
  • Business
  • Entertainment
  • Videos
  • Sports
  • Technology
  • Offbeat
  • Blog
  • Contact
Have an existing account? Sign In
Follow US
© 2022 Photonews. All Rights Reserved.
PhotoNews Pakistan > Business > Khaqan Abbasi offers himself for trial if corruption unearthed
Business

Khaqan Abbasi offers himself for trial if corruption unearthed

Web Desk
By Web Desk Published September 15, 2015 5 Min Read
Share
SHARE
Petroleum and Natural Resources Minister Shahid Khaqan Abbasi has offered himself for trial for any irregularities in the award of a liquefied natural gas (LNG) terminal contract and subsequent gas imports.

“If anyone needs record for investigation, I am available to take responsibility,” Abbasi said at a press conference in Islamabad earlier yesterday.

He was responding to allegations of corruption in LNG projects levelled by Sindh Finance Minister Syed Murad Ali Shah on Sunday.

“There may be procedural lapses, but there is not a single sign of corruption in this government,” he said, pointing out that the LNG terminal contract was awarded after inviting bids from investors.

He said the terminal’s tolling fee was $0.66 per million British thermal units (mmbtu) for 15 years and recalled that the Pakistan Peoples Party (PPP) government had attempted four times to implement the LNG project with a tolling fee of $1 per mmbtu for an integrated LNG supply contract.

Calling the Sindh finance minister’s remarks an attempt to gain political ground, Abbasi said gas issues had been discussed and settled with the province.

Over the years, gas production in the country has dropped 550 million cubic feet per day (mmcfd), which constitutes 20% of the output.

Earlier, Sui Northern Gas Pipelines (SNGPL) was drawing 1,700 mmcfd and Sui Southern Gas Company (SSGC) was receiving 1,200 mmcfd when production stood at 2,900 mmcfd, but now SNGPL is getting 1,150 mmcfd and SSGC is receiving 1,250 mmcfd, though output has dropped to 2,400 mmcfd.

This, according to Abbasi, shows that Sindh’s share has increased to 1,250 mmcfd whereas the impact of fall in gas production has been felt by SNGPL, which has affected the Punjab province.

The winter season would be very harsh for Punjab consumers as only domestic consumers would receive gas, he said, adding CNG stations would be running if LNG was available.

According to him, gas utilities are in swap arrangement, according to which LNG is being consumed in Karachi and against this SNGPL is utilising locally produced gas.

Responding to the Sindh’s demand to take the matter of LNG imports to the Council of Common Interests (CCI), Abbasi clarified that like oil imported gas did not fall within the purview of the CCI.

He said Thar coal came under the domain of the Sindh government and everyone knew what they had done since 2008. Now, he added, this project was being implemented as part of the China-Pakistan Economic Corridor (CPEC).

“LNG, Thar coal, imported coal, IP (Iran-Pakistan) and Tapi pipelines will meet energy needs; Thar coal is very important but it cannot satisfy the entire demand.”

Apart from these, work on the LNG Gwadar pipeline is also under way. A Chinese company will contribute 85% of the financing whereas the Pakistan government will provide 15% of the cost and will have its ownership. The pipeline will be completed in 2017 and carry 1.5 billion cubic feet of gas per day.

Talking about shale gas, the minister claimed that analysis showed that Pakistan had more reserves than estimates of the US Energy Information Administration. In this regard, a final study will be completed in December.

However, he clarified that at current oil prices, shale gas drilling was not feasible as the government would have to offer $12 per mmbtu to energy companies to tap the resource.

Abbasi announced that the Ministry of Petroleum would again present the anti-gas theft bill with some changes in the upcoming National Assembly session for approval.

The ministry has also sent a summary to the CCI for regulating liquefied petroleum gas (LPG) prices in order to provide relief to the consumers. According to the plan, the government will fix margins of marketing companies and distributors. Abbasi termed the increase of Rs6 per kg in LPG price unjustified.

Regarding renewable energy sources, he said the government had earlier imposed a ban on new wind and solar projects, but the prime minister reversed the decision.

Also read:Second LNG terminal project too controversial to handle
Share This Article
Facebook Twitter Pinterest Whatsapp Whatsapp LinkedIn Email Copy Link Print
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Advertisement

Recent Posts

Taliban split in Badakhshan reported as analyst claims commander Juma Khan Fateh formed a breakaway armed group.

Taliban transport extortion alleged in Balkh

Pakistan Visa-Free Online Visa

Pakistan Türkiye Trade Target Set at $5 billion

Abdenour Jbili, president of Cluster Maintenance 4.0, speaking at an event.

ReliX Industrial Framework Launched for African Factories

Post Archives

More Popular from Photonews

A passenger airplane flying through an orange sunset sky above clouds.
Pakistan

South Air AOC Issued by CAA Before Pakistan Launch

1 Min Read
Trump Putin Ukraine war
World

Putin Congratulates Trump on 250th US Independence Anniversary

1 Min Read
Late Iran's supreme leader Ayatollah Ali Khamenei, Iran's Supreme Leader, addresses the public in Tehran on June 4, 2021.
Top NewsWorld

Khamenei Funeral Tehran Preparations Begin at Grand Mosalla

2 Min Read
Sports

Argentina Cape Verde 3-2: Messi Goal Ends Fairytale Run

Argentina beat Cape Verde 3-2 after extra time at the FIFA World Cup 2026 in Miami,…

July 4, 2026
Pakistan

Geo News Apology Issued as PEMRA Orders 15-Day Ban

ISLAMABAD: Geo News issued an apology over footage aired during its 10th Muharram “Safar-e-Ishq” transmission, while…

July 3, 2026
Pakistan

Pakistan India Afghanistan Row Deepens Over Strikes

ISLAMABAD: Pakistan, India, Afghanistan tensions deepened after the Foreign Office rejected New Delhi’s statement on Pakistani…

July 1, 2026
Punjab

Lahore Foreign Women Assault: Medical Report Confirms Case

LAHORE, Punjab: A medical report confirmed sexual assault of one foreign woman in the Lahore foreign…

July 4, 2026
PhotoNews Pakistan

Always Stay Up to Date

Subscribe to our newsletter to get our newest articles instantly!

    Categories

    • World
    • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Balochistan
    • Azad Jammu Kashmir

     

    • Top News
    • Business
    • Entertainment
    • Sports
    • Videos
    • Tech
    • Offbeat
    • Blog
    • About Us
    • Privacy Policy
    • Code of Ethics & Editorial Standards

    © 2026 Phototnews
    All Rights Reserved.

    Welcome Back!

    Sign in to your account

    Lost your password?