PhotoNews
  • Home
  • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Azad Jammu Kashmir
    • Balochistan
    • Gilgit – Baltistan
  • World
  • Business
  • Entertainment
  • Videos
    EntertainmentVideos

    Sansixto ft. Dife MMP, ‘D-Clara’: The rebuttal to Shakira’s hit with Bizarrap

    January 30, 2023 2 Min Read
    PunjabVideos

    Government completely sealed Lal Haveli: Sheikh Rashid

    January 30, 2023 3 Min Read
    EntertainmentVideos

    Taylor Swift’s new music video for ‘Lavender Haze’ sends fans into a frenzy

    January 28, 2023 2 Min Read
  • Sports
  • Offbeat
  • Blog
  • Contact
Reading: Khaqan Abbasi offers himself for trial if corruption unearthed
PhotoNewsPhotoNews
Aa
Search
  • Home
  • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Balochistan
    • Azad Jammu Kashmir
    • Gilgit – Baltistan
  • World
  • Business
  • Entertainment
  • Videos
  • Sports
  • Offbeat
  • Blog
  • Contact
Have an existing account? Sign In
Follow US
© 2022 Photonews. All Rights Reserved.
PhotoNews > Business > Khaqan Abbasi offers himself for trial if corruption unearthed
Business

Khaqan Abbasi offers himself for trial if corruption unearthed

Last updated: 2015/09/15 at 10:32 AM
5 Min Read
Share
SHARE
Petroleum and Natural Resources Minister Shahid Khaqan Abbasi has offered himself for trial for any irregularities in the award of a liquefied natural gas (LNG) terminal contract and subsequent gas imports.

“If anyone needs record for investigation, I am available to take responsibility,” Abbasi said at a press conference in Islamabad earlier yesterday.

He was responding to allegations of corruption in LNG projects levelled by Sindh Finance Minister Syed Murad Ali Shah on Sunday.

“There may be procedural lapses, but there is not a single sign of corruption in this government,” he said, pointing out that the LNG terminal contract was awarded after inviting bids from investors.

He said the terminal’s tolling fee was $0.66 per million British thermal units (mmbtu) for 15 years and recalled that the Pakistan Peoples Party (PPP) government had attempted four times to implement the LNG project with a tolling fee of $1 per mmbtu for an integrated LNG supply contract.

Calling the Sindh finance minister’s remarks an attempt to gain political ground, Abbasi said gas issues had been discussed and settled with the province.

Over the years, gas production in the country has dropped 550 million cubic feet per day (mmcfd), which constitutes 20% of the output.

Earlier, Sui Northern Gas Pipelines (SNGPL) was drawing 1,700 mmcfd and Sui Southern Gas Company (SSGC) was receiving 1,200 mmcfd when production stood at 2,900 mmcfd, but now SNGPL is getting 1,150 mmcfd and SSGC is receiving 1,250 mmcfd, though output has dropped to 2,400 mmcfd.

This, according to Abbasi, shows that Sindh’s share has increased to 1,250 mmcfd whereas the impact of fall in gas production has been felt by SNGPL, which has affected the Punjab province.

The winter season would be very harsh for Punjab consumers as only domestic consumers would receive gas, he said, adding CNG stations would be running if LNG was available.

According to him, gas utilities are in swap arrangement, according to which LNG is being consumed in Karachi and against this SNGPL is utilising locally produced gas.

Responding to the Sindh’s demand to take the matter of LNG imports to the Council of Common Interests (CCI), Abbasi clarified that like oil imported gas did not fall within the purview of the CCI.

He said Thar coal came under the domain of the Sindh government and everyone knew what they had done since 2008. Now, he added, this project was being implemented as part of the China-Pakistan Economic Corridor (CPEC).

“LNG, Thar coal, imported coal, IP (Iran-Pakistan) and Tapi pipelines will meet energy needs; Thar coal is very important but it cannot satisfy the entire demand.”

Apart from these, work on the LNG Gwadar pipeline is also under way. A Chinese company will contribute 85% of the financing whereas the Pakistan government will provide 15% of the cost and will have its ownership. The pipeline will be completed in 2017 and carry 1.5 billion cubic feet of gas per day.

Talking about shale gas, the minister claimed that analysis showed that Pakistan had more reserves than estimates of the US Energy Information Administration. In this regard, a final study will be completed in December.

However, he clarified that at current oil prices, shale gas drilling was not feasible as the government would have to offer $12 per mmbtu to energy companies to tap the resource.

Abbasi announced that the Ministry of Petroleum would again present the anti-gas theft bill with some changes in the upcoming National Assembly session for approval.

The ministry has also sent a summary to the CCI for regulating liquefied petroleum gas (LPG) prices in order to provide relief to the consumers. According to the plan, the government will fix margins of marketing companies and distributors. Abbasi termed the increase of Rs6 per kg in LPG price unjustified.

Regarding renewable energy sources, he said the government had earlier imposed a ban on new wind and solar projects, but the prime minister reversed the decision.

Also read:Second LNG terminal project too controversial to handle
TAGGED: corruption, Khaqan Abbasi, SNGPL, SSGC
admin September 15, 2015
Share this Article
Facebook Twitter Pinterest Whatsapp Whatsapp LinkedIn Email Copy Link Print
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

Toyota Pakistan, Indus Motor Company

Toyota Pakistan shuts down plant till Feb 14

USA and Russia Nuclear Arms Control

Russia warns US: the end of nuclear arms control may be nigh

Coach Nick Sirianni's daughter, Coach Nick Sirianni, Philadelphia Eagles, NFC Championship

Coach Nick Sirianni’s daughter imitates him in a press conference

Pakistan Fuel Crisis

Pakistan braces for fuel shortages amid liquidity crisis

Mbappe reacts to Neymar

Viral Video: Mbappe’s hilarious reaction to Neymar’s freekick

Kim Kardashian, Jennifer Lopez and Oprah

Oprah Winfrey celebrates 69th birthday with JLo and Kim Kardashian

Post Archives

More Popular from Photonews

Pepper Sprays Review
Blog

Pepper Sprays: A Review

13 Min Read
Karachi's Crime Rate
Blog

Guns: Why we need them more then ever before

5 Min Read
Novak Djokovic, Australian Open, Australian Open Final
Sports

Djokovic surges into 10th Australian Open final

5 Min Read
Entertainment

Mia Khalifa Compares herself to the Virgin Mary

Mia Khalifa is touring between European fashion shows this fall. The former porn star and social…

January 22, 2023
Pakistan

NIH Pakistan reports Two Covid19 deaths in 24 hours

The National Institute of Health (NIH) has reported that Pakistan has had two Covid-19-related deaths and…

January 4, 2023
Entertainment

Dua Lipa’s New Year’s thong wows fans

Dua Lipa also shared a social media post to bring in the new year, as many…

January 2, 2023
Sports

Djokovic surges into 10th Australian Open final

A rampant Novak Djokovic surged into a 10th Australian Open final Friday to close in on…

January 28, 2023
PhotoNews

Always Stay Up to Date

Subscribe to our newsletter to get our newest articles instantly!

Categories

  • World
  • Pakistan
  • Punjab
  • Sindh
  • Khyber Pakhtunkhwa
  • Balochistan
  • Azad Jammu Kashmir

 

  • Top News
  • Business
  • Entertainment
  • Sports
  • Videos
  • Tech
  • Offbeat
  • Blog

© 2023 Phototnews
All Rights Reserved.

Welcome Back!

Sign in to your account

Lost your password?