Skip to content
Photonews Logo Photonews logo
  • Home
  • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Azad Jammu Kashmir
    • Balochistan
    • Gilgit – Baltistan
  • World
  • Business
  • Entertainment
  • Videos
    U.S. Navy SEAL Jocko Willink in 2024 on the “Jocko Podcast” that his unit took part in the operation that captured Yaqoubi.
    Videos

    Iraq: Mustafa Yaqoubi Arrest Preceded 2004 Sadr Uprising

    September 17, 2026 2 Min Read
    Fox NFL Reporter Erin Andrews 2009 hotel video
    SportsVideos

    Fox NFL Reporter Erin Andrews Recalls Career Fears After 2009 Hotel Video

    September 12, 2026 1 Min Read
    Sharon Stone ‘Orbs’ During Stroke Recovery
    Videos

    Sharon Stone Recalls ‘Orbs’ During Stroke Recovery

    September 12, 2026 1 Min Read
  • Sports
  • Technology
  • Offbeat
  • Blog
  • Contact
Reading: Govt demands K-Electric stop using National grid power
PhotoNews PakistanPhotoNews Pakistan
Font ResizerAa
Search
  • Home
  • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Balochistan
    • Azad Jammu Kashmir
    • Gilgit – Baltistan
  • World
  • Business
  • Entertainment
  • Videos
  • Sports
  • Technology
  • Offbeat
  • Blog
  • Contact
Have an existing account? Sign In
Follow US
© 2022 Photonews. All Rights Reserved.
PhotoNews Pakistan > Business > Govt demands K-Electric stop using National grid power
Business

Govt demands K-Electric stop using National grid power

Web Desk
By Web Desk Published February 4, 2015 4 Min Read
Share
SHARE

The standoff between K-Electric and the water and power ministry continues on as the ministry said it had demanded that the privately-owned utility company start utilising the full capacity of its power plants, but stopped short of threatening to cut off power supply from the national grid to the country’s financial capital.

At a hearing of the National Assembly Water and Power Committee, Yunus Dhaga, the water and power secretary, said that the state-owned National Transmission and Dispatch Company (NTDC) has sent a letter to the Abraaj Capital-owned K-Electric asking them to utilise their own power generation capacity after the agreement between K-Electric and NTDC for the latter to supply 650 MW to Karachi had expired on January 26.

“K-Electric can generate 2,000 to 2,500 MW of electricity with its own power generation plants. Despite the expiration of NTDC’s agreement with K-Electric, electricity is being supplied to the company,” said Dhaga, adding that power shutdowns in Karachi could end if K-Electric runs its own power plants at full capacity. He said that the power currently being supplied to Karachi can then be supplied to other parts of the country.

“If K-Electric generates electricity as per full capacity of its power plants, then residents of Karachi and industries of the city will not face power outages as there will be no power load shedding,” said Dhaga, adding that negotiations between the ministry and the company are ongoing.

K-Electric management has, in the past, stated that it is unable to run many of its power plants due to the fact that the state-owned Sui Southern Gas Company does not supply K-Electric’s generating stations with the full amount of gas it needs in order to generate electricity at cheap rates.

Yet even while the government insists that K-Electric run those power plants with expensive furnace oil as fuel rather than cheap natural gas, the government’s own thermal power plants – which collectively have the capacity to produce 6,378 MW of electricity – are being kept completely offline for the exact same reason: the government is diverting the gas they need to produce electricity cheaply to textile companies, and refusing to use furnace oil as an alternative fuel because that would mean that the cost of producing electricity would be too high.

In his testimony before the committee on Tuesday, Dhaga said that the country currently faces a gap of approximately 5,000 MW between demand and supply of electricity, but made no reference to the more than 6,300 MW of state-owned power generation capacity being kept offline, instead diverting attention to the 650 MW of electricity being supplied to Karachi.

The secretary said that the country needs to add an additional 8,500 MW of power generation capacity by 2017 to overcome the chronic power cuts that last for several hours a day in nearly all parts of the country.

Also Read:President declines to continue the provision of 650MW to K-Electric

Share This Article
Facebook Twitter Pinterest Whatsapp Whatsapp LinkedIn Email Copy Link Print
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Advertisement

Bank Alfalah Pehchan account

Recent Posts

Thick black smoke rises near an airport terminal as emergency crews respond to a damaged aircraft on the runway.

Riyadh Airport Attacks Kill 3, Damage Saudia Aircraft

Map of Iran featuring the national flag over a glowing digital world map with AI symbols and robotic hands.

Iranian AI Influence Campaign Placed 100 Articles: OpenAI

US-Iran deal ends naval blockade as Washington and Tehran prepare for technical talks.

Iran-US Talks Will Continue Despite Attacks, Pezeshkian Says

Post Archives

More Popular from Photonews

Lionel Messi and Cristiano Ronaldo wearing Argentina and Portugal football shirts
Sports

Cristiano Ronaldo Salutes Messi After Argentina Farewell

2 Min Read
People dancing at a rooftop party at a private hotel in Hunza.
Gilgit - Baltistan

Hunza Officials Seal Hotel After Viral Dance Party Video

2 Min Read
Central Bank of Iraq building with the CBI emblem in Baghdad.
Business

Iraqi Dinar Falls 13% as Public Dollar Rate Reaches 1,520

2 Min Read
Entertainment

Megan Fox Video: Letterboxd Disables Instagram Comments

Letterboxd disabled comments on an Instagram video featuring actor Megan Fox and director Karyn Kusama after…

October 6, 2026
Tech

Instagram Instants: Ofcom Opens Meta Safety Investigation

UK communications regulator Ofcom opened an investigation on Tuesday into whether Meta adequately assessed Instagram Instants’…

October 7, 2026
Top NewsWorld

Iran Air Defences Hit Aircraft Over Qeshm, Media Say

QESHM: Iran’s air defences hit at least one aircraft over the island in the Strait of…

October 4, 2026
Top NewsWorld

Hezbollah Received $200 Million From Iran, Sources Say

BEIRUT: Hezbollah received $200 million from Iran in September to assist Lebanese displaced by war with…

October 8, 2026
PhotoNews Pakistan

Always Stay Up to Date

Subscribe to our newsletter to get our newest articles instantly!

    Categories

    • World
    • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Balochistan
    • Azad Jammu Kashmir

     

    • Top News
    • Business
    • Entertainment
    • Sports
    • Videos
    • Tech
    • Offbeat
    • Blog
    • About Us
    • Privacy Policy
    • Code of Ethics & Editorial Standards

    © 2026 Phototnews
    All Rights Reserved.

    Welcome Back!

    Sign in to your account

    Lost your password?