Skip to content
Photonews Logo Photonews logo
  • Home
  • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Azad Jammu Kashmir
    • Balochistan
    • Gilgit – Baltistan
  • World
  • Business
  • Entertainment
  • Videos
    GA-20 and Grammy-winning musician Charlie Musselwhite perform “I Can’t Hold Out” during CBS Saturday Morning’s Saturday Sessions on August 1.
    Videos

    GA-20 and Charlie Musselwhite Perform ‘I Can’t Hold Out’

    August 2, 2026 1 Min Read
    Ricky Gervais Alley Cats official Netflix trailer
    Videos

    Ricky Gervais ‘Alley Cats’ Trailer Sets August 7 Debut

    July 23, 2026 2 Min Read
    Sam Fender Olivia Dean break UK chart record with Rein Me In after 16 weeks at No. 1.
    Videos

    Sam Fender, Olivia Dean Break 30-Year UK Chart Record

    July 12, 2026 2 Min Read
  • Sports
  • Technology
  • Offbeat
  • Blog
  • Contact
Reading: Govt demands K-Electric stop using National grid power
PhotoNews PakistanPhotoNews Pakistan
Font ResizerAa
Search
  • Home
  • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Balochistan
    • Azad Jammu Kashmir
    • Gilgit – Baltistan
  • World
  • Business
  • Entertainment
  • Videos
  • Sports
  • Technology
  • Offbeat
  • Blog
  • Contact
Have an existing account? Sign In
Follow US
© 2022 Photonews. All Rights Reserved.
PhotoNews Pakistan > Business > Govt demands K-Electric stop using National grid power
Business

Govt demands K-Electric stop using National grid power

Web Desk
By Web Desk Published February 4, 2015 4 Min Read
Share
SHARE

The standoff between K-Electric and the water and power ministry continues on as the ministry said it had demanded that the privately-owned utility company start utilising the full capacity of its power plants, but stopped short of threatening to cut off power supply from the national grid to the country’s financial capital.

At a hearing of the National Assembly Water and Power Committee, Yunus Dhaga, the water and power secretary, said that the state-owned National Transmission and Dispatch Company (NTDC) has sent a letter to the Abraaj Capital-owned K-Electric asking them to utilise their own power generation capacity after the agreement between K-Electric and NTDC for the latter to supply 650 MW to Karachi had expired on January 26.

“K-Electric can generate 2,000 to 2,500 MW of electricity with its own power generation plants. Despite the expiration of NTDC’s agreement with K-Electric, electricity is being supplied to the company,” said Dhaga, adding that power shutdowns in Karachi could end if K-Electric runs its own power plants at full capacity. He said that the power currently being supplied to Karachi can then be supplied to other parts of the country.

“If K-Electric generates electricity as per full capacity of its power plants, then residents of Karachi and industries of the city will not face power outages as there will be no power load shedding,” said Dhaga, adding that negotiations between the ministry and the company are ongoing.

K-Electric management has, in the past, stated that it is unable to run many of its power plants due to the fact that the state-owned Sui Southern Gas Company does not supply K-Electric’s generating stations with the full amount of gas it needs in order to generate electricity at cheap rates.

Yet even while the government insists that K-Electric run those power plants with expensive furnace oil as fuel rather than cheap natural gas, the government’s own thermal power plants – which collectively have the capacity to produce 6,378 MW of electricity – are being kept completely offline for the exact same reason: the government is diverting the gas they need to produce electricity cheaply to textile companies, and refusing to use furnace oil as an alternative fuel because that would mean that the cost of producing electricity would be too high.

In his testimony before the committee on Tuesday, Dhaga said that the country currently faces a gap of approximately 5,000 MW between demand and supply of electricity, but made no reference to the more than 6,300 MW of state-owned power generation capacity being kept offline, instead diverting attention to the 650 MW of electricity being supplied to Karachi.

The secretary said that the country needs to add an additional 8,500 MW of power generation capacity by 2017 to overcome the chronic power cuts that last for several hours a day in nearly all parts of the country.

Also Read:President declines to continue the provision of 650MW to K-Electric

Share This Article
Facebook Twitter Pinterest Whatsapp Whatsapp LinkedIn Email Copy Link Print
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Advertisement

Recent Posts

Shark swimming underwater beside a hurricane satellite image

Shark Hurricane Sensors Gather Near-Real-Time Data

Wafflix founder Mir Ali Raza standing next to the Wafflix "W" logo at the company's office.

Mir Raza Ali Autopsy Board Sends Samples for Tests

Leo Messi with his mother and father Jorge Messi

Jorge Messi Dies at 68 After Long Illness in Rosario

Post Archives

More Popular from Photonews

US-Iran deal ends naval blockade as Washington and Tehran prepare for technical talks.
Top NewsWorld

Trump Says US-Iran Talks Continue Despite Tehran’s Denial

2 Min Read
Editorial image of Mir Raza Ali, the 25-year-old businessman who was found shot dead in Gulistan-e-Jauhar, Karachi.
Sindh

Mir Raza Ali CCTV Shows Lone Rider Near Crime Scene

2 Min Read
Cristiano Ronaldo and Georgina Rodríguez seated together during a public event. Image Credit: Anadolu via Getty Images.
Sports

Ronaldo-Georgina Wedding Reportedly Set for Aug. 8 in Madeira

1 Min Read
Khyber Pakhtunkhwa

Peshawar Women’s Open Court Addresses Service Complaints

PESHAWAR, Khyber Pakhtunkhwa: Peshawar women’s open court addressed public-service complaints from women in Tehsil Chamkani on…

August 7, 2026
Sindh

Mir Raza Ali CCTV Shows Him Discarding Phone, Police Say

KARACHI: New CCTV footage from Mir Raza Ali appears to show the businessman discarding his mobile…

August 4, 2026
Sindh

Mir Raza Ali Case: CCTV Shows Him With a Pistol Before Death

KARACHI, Sindh: New footage in the Mir Raza Ali case showed the businessman handling a pistol…

August 3, 2026
Entertainment

Spider-Man: Brand New Day Eyes $140M Second Weekend

“Spider-Man: Brand New Day” could earn between $135 million and $140 million during its second domestic…

August 8, 2026
PhotoNews Pakistan

Always Stay Up to Date

Subscribe to our newsletter to get our newest articles instantly!

    Categories

    • World
    • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Balochistan
    • Azad Jammu Kashmir

     

    • Top News
    • Business
    • Entertainment
    • Sports
    • Videos
    • Tech
    • Offbeat
    • Blog
    • About Us
    • Privacy Policy
    • Code of Ethics & Editorial Standards

    © 2026 Phototnews
    All Rights Reserved.

    Welcome Back!

    Sign in to your account

    Lost your password?