Skip to content
Photonews Logo Photonews logo
  • Home
  • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Azad Jammu Kashmir
    • Balochistan
    • Gilgit – Baltistan
  • World
  • Business
  • Entertainment
  • Videos
    Angry Birds Movie 3 trailer by Paramount animated sequel before December 2026 release
    Videos

    Angry Birds Movie 3 Trailer Sets Dec 23 Release

    June 30, 2026 1 Min Read
    Olivia Wilde Trailer Gregg Araki Thriller I Want Your Sex Trailer Shows Olivia
    Videos

    Olivia Wilde Trailer Shows Gregg Araki Thriller I Want Your Sex Trailer Shows Olivia

    June 11, 2026 1 Min Read
    Alia Bhatt Alpha teaser shows the actor entering action mode in YRF’s female-led spy thriller.
    Videos

    Alia Bhatt Alpha Teaser Shows Bobby Deol Training Her

    June 10, 2026 1 Min Read
  • Sports
  • Technology
  • Offbeat
  • Blog
  • Contact
Reading: No water No power: K-E blames dirt and grime!
PhotoNews PakistanPhotoNews Pakistan
Font ResizerAa
Search
  • Home
  • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Balochistan
    • Azad Jammu Kashmir
    • Gilgit – Baltistan
  • World
  • Business
  • Entertainment
  • Videos
  • Sports
  • Technology
  • Offbeat
  • Blog
  • Contact
Have an existing account? Sign In
Follow US
© 2022 Photonews. All Rights Reserved.
PhotoNews Pakistan > Sindh > No water No power: K-E blames dirt and grime!
Sindh

No water No power: K-E blames dirt and grime!

Web Desk
By Web Desk Published July 14, 2015 4 Min Read
Share
SHARE

With over half the city plunged into darkness for the fourth time in one week, the K-Electric has utterly failed the citizens of Karachi.

The latest breakdown on Sunday night affected a large part of the city, with power cut off in Malir, North Nazimabad, Gulshan-e-Maymar, Shah Faisal Colony, Water Pump, Gulistan-e-Jauhar, Gulshan-e-Iqbal, Korangi, Bath Island, Defence, Federal B Area, Manzoor Colony, Gulshan-e-Hadeed, Clifton, PECHS and Shadman Town.

First K-E blamed 99% humidity for the breakdown in Pipri. It was a categorical lie since the humidity in that area was 66%.

Now the privatized monopoly has stated that the infrastructure is affected by “dirt and grime” and as such due to atmosthperic conditions nothing can be done and the people should basically grin and bear it.

Meanwhile the residents of these areas grappled with the heat in the absence of fans and air-conditioners, there was another problem the hepless denizens of this sorry city had to brave.

 The Karachi Water and Sewage Board suspended the operations of Dhabeji, Pipri, Gharo, North East Karachi and Hub pumping stations, stopping the supply of water to major parts of the city.

The board’s spokesperson, Nazeer Matin, reasoned that the frequent power cuts would cause the machinery to break down if it was kept running. “If the power at the Dhabeji pumping station is disturbed for one hour, the supply of water to the city is disturbed for 48 hours,” he said.

His words seemed to ring true as on Monday morning, a 72-inch-wide water pipeline on the Dhabeji pumping station developed cracks, resulting in a shortfall of at least 200 million gallons per day (MGD) to the city. The pipeline developed cracks after an electricity failure at one of the board’s pumping stations led to the water flowing back. Since the water pressure was too high, the old pipeline could not sustain it and developed cracks. According to Matin, the damaged pipeline would exert additional financial burden on the already struggling water board.

The rising temperature and increase in water consumption during the month of Ramazan has increased the demand for water manifold. Matin told the media that Karachi’s water requirement was 1,100 (MGD), while only 540 was available for the entire city. Water supply from the Hub Station has decreased from 100 MGD to 34 MGD because of the frequent disruption of power supply, he explained.

At around 3:45am on Sunday night, a major power outage occurred at the pumping stations due to which water supply was stopped to the entire city. The power supply resumed at 7:20am, after which the pumping of water was restarted. The three-hour power suspension caused a loss in supply of 128 million gallons of water from Dhabeji, 18 million gallons water from Pipri, 18 million gallons from North-East Karachi and eight million gallons from Hub, disturbing the water distribution in the city.

For Matin, the frequent power cuts could create immense water scarcity in the city, with the distribution of water already disturbed in most parts.

“The water circulation could take four days to come back to normal because of the frequent power failures this past week,” said Matin.

Speaking about a backup plan for the water distribution in the city, Matin said electricity was needed at to pump water come what may. He added that there was only one way to save water in this condition, and that is to use it carefully.

Also read:K-Electric on the run after 5th Karachi blackout 
Share This Article
Facebook Twitter Pinterest Whatsapp Whatsapp LinkedIn Email Copy Link Print
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Advertisement

Recent Posts

AWS logo displayed on a futuristic digital chip surrounded by AI, cloud, cybersecurity and data analytics icons.

AWS AI Engineers Unit Gets $1 billion Amazon Push

USMCA letters displayed with the United States, Mexico and Canada flags in a trade agreement graphic.

USMCA Review Puts $1.6tn Trade Pact in Talks

DAX index displayed in a futuristic European stock market dashboard with candlestick charts, trading data and upward market arrows.

European Markets Rise as DAX Nears 25,000

Post Archives

More Popular from Photonews

Brazil winger Gabriel Martinelli celebrates after scoring a dramatic 95th-minute goal against Japan in Houston.
Sports

Brazil Beat Japan 2-1 as Martinelli Scores 95th-Minute Winner

1 Min Read
Robert Lewandowski wearing Chicago Fire FC kit after signing with the MLS club through the 2027-28 season.
Sports

Lewandowski Chicago Fire Deal Runs Through 2027-28 MLS Season

2 Min Read
Palestinian couples in traditional wedding attire walk during a mass wedding ceremony at Jabalia Refugee Camp in northern Gaza.
World

Gaza Mass Wedding Unites 150 Couples in Jabalia

1 Min Read
Entertainment

House of the Dragon Otto Hightower Death Stuns Fans

“House of the Dragon” killed off Otto Hightower in Season 3, Episode 2, as Rhaenyra Targaryen…

June 29, 2026
World

UN Charter Day Speech Urges Stronger Cooperation

New York, United States: On Friday, United Nations Secretary-General António Guterres delivered remarks on UN Charter…

June 27, 2026
Offbeat

Elon Musk Muharram Procession Video Sparks Debate on X

Elon Musk’s repost of a viral Muharram procession video on X triggered debate this week, as…

June 26, 2026
Pakistan

Afghan Envoy Demarche Issued Over Karachi Attack

Islamabad: Pakistan issued an Afghan envoy demarche over the Karachi Rangers camp attack after officials said…

June 29, 2026
PhotoNews Pakistan

Always Stay Up to Date

Subscribe to our newsletter to get our newest articles instantly!

    Categories

    • World
    • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Balochistan
    • Azad Jammu Kashmir

     

    • Top News
    • Business
    • Entertainment
    • Sports
    • Videos
    • Tech
    • Offbeat
    • Blog
    • About Us
    • Privacy Policy
    • Code of Ethics & Editorial Standards

    © 2026 Phototnews
    All Rights Reserved.

    Welcome Back!

    Sign in to your account

    Lost your password?