Skip to content
Photonews Logo Photonews logo
  • Home
  • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Azad Jammu Kashmir
    • Balochistan
    • Gilgit – Baltistan
  • World
  • Business
  • Entertainment
  • Videos
    Olivia Wilde Trailer Gregg Araki Thriller I Want Your Sex Trailer Shows Olivia
    Videos

    Olivia Wilde Trailer Shows Gregg Araki Thriller I Want Your Sex Trailer Shows Olivia

    June 11, 2026 1 Min Read
    Alia Bhatt Alpha teaser shows the actor entering action mode in YRF’s female-led spy thriller.
    Videos

    Alia Bhatt Alpha Teaser Shows Bobby Deol Training Her

    June 10, 2026 1 Min Read
    Fire Point co-owner Denys Shtilerman speaks during an interview with journalist Alesia Batsman.
    Videos

    Ukraine Nuclear Weapons Claim Made By Fire Point Co-Owner

    June 5, 2026 2 Min Read
  • Sports
  • Technology
  • Offbeat
  • Blog
  • Contact
Reading: Gwadar LNG pipeline: China cuts cost estimate by another $200 million
PhotoNews PakistanPhotoNews Pakistan
Font ResizerAa
Search
  • Home
  • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Balochistan
    • Azad Jammu Kashmir
    • Gilgit – Baltistan
  • World
  • Business
  • Entertainment
  • Videos
  • Sports
  • Technology
  • Offbeat
  • Blog
  • Contact
Have an existing account? Sign In
Follow US
© 2022 Photonews. All Rights Reserved.
PhotoNews Pakistan > Business > Gwadar LNG pipeline: China cuts cost estimate by another $200 million
Business

Gwadar LNG pipeline: China cuts cost estimate by another $200 million

Web Desk
By Web Desk Published June 18, 2016 4 Min Read
Share
SHARE

Pakistan has managed to land a gas pipeline deal at a lower price as China Petroleum Pipeline Bureau, a Chinese company, has revised the cost of laying the pipeline downwards to $1.3 billion after negotiations with the government in Islamabad.

According to an official, Pakistan and the Chinese company had initialed an agreement for building a liquefied natural gas (LNG) pipeline from Gwadar, but the company has now lowered the contract price to $1.3 billion compared to $1.5 billion quoted in the financial bid given to Inter-state Gas Systems.

Earlier, China had expressed concerns over the slow progress being made in awarding the contract for the LNG pipeline.

“The revised cost is even less than the cost at which gas utilities – Sui Northern Gas Pipelines and Sui Southern Gas Company – are augmenting their existing pipeline network to enhance the transmission capacity to 1.2 billion cubic feet per day,” the official said.

China Petroleum Pipeline Bureau, which was designated by the Chinese government, brought down the cost estimate for laying the pipeline as well as installation of compressors after holding talks with a negotiation committee constituted by the government of Pakistan.

A revised PC-1 of the project has been approved by the Central Development Working Party of the Planning Commission. Now, the project has been sent to the Executive Committee of National Economic Council (Ecnec) for formal approval.

According to the official, Pakistan will negotiate a loan agreement with the Export-Import Bank of China that has already made an offer in this regard.

He said the gas utilities were working on extending the pipeline network at a cost of $1.1 billion that amounted to $34 per inch metre, but the cost of building the Gwadar LNG pipeline was $32 per inch metre.

“The deal with China is priced lower than the cost being incurred by local gas companies on extending their network,” he said.

The Chinese company will also construct an LNG terminal at Gwadar Port on build-and-operate model and it will be able to handle 600 million cubic feet of LNG per day.

The government would negotiate with the Chinese company a tolling fee keeping in view the fee for the other two LNG terminals being built by Pakistan companies, he said.

Elengy Terminal Pakistan Limited, a subsidiary of Engro Corporation, is running the first LNG terminal at Port Qasim with a fee of 66 cents per million British thermal units (mmbtu).

For the second LNG terminal at the port, the contract is being awarded to Pakistan GasPort Limited that has offered a tolling fee of 41.77 cents per mmbtu.

The previous Pakistan Peoples Party-led government had imposed gas infrastructure development cess (GIDC) on gas consumers for laying these pipelines and so far Rs183 billion has been collected.

However, the current PML-N government has spent the entire collection on metro bus projects and nothing is left for implementing gas import projects.

For the Gwadar LNG pipeline and terminal project, China will provide 85% of financing whereas Pakistan will contribute the remaining 15%. This is an additional burden that gas consumers will be bearing in addition to paying billions of rupees in GIDC.

Share This Article
Facebook Twitter Pinterest Whatsapp Whatsapp LinkedIn Email Copy Link Print
Leave a comment

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Advertisement

Recent Posts

US-Iran deal ends naval blockade as Washington and Tehran prepare for technical talks.

Iran deal Collapse Risk Grows Over Hormuz, Lebanon

Ashura Quetta Balochistan procession showing mourners carrying religious flags.

Ashura Security Balochistan Tightened With 3,000 Deployed

Hormuz transit routes must follow Iran-approved paths.

Hormuz Transit Routes Limited to Iran-Approved Paths

Post Archives

More Popular from Photonews

Iran IAEA inspections dispute deepened after Tehran rejected Trump’s claim that it agreed to a full review of nuclear sites.
World

Nuclear Stockpiles Rise But No Arms Race Yet, IAEA Says

1 Min Read
FIFA World Cup upcoming match schedule with ET and Pakistan timings, fixtures, dates and official match-centre links.
Sports

FIFA World Cup 2026: Day 13 Match Schedule Reference

2 Min Read
China Iran US talks continue in Switzerland as Beijing backs Pakistan and Qatar mediation efforts
World

China Urges Iran, US to Keep Talks Moving Forward

2 Min Read
Sports

FIFA World Cup Upcoming Match Schedule

World Cup fixtures continue on Friday, June 26, with six group-stage matches, including Norway vs France…

June 26, 2026
Sindh

Yellow Line BRT Corruption: Zameer Abbasi Named In Rs8.5bn Report

Karachi, Sindh: An anti-corruption court heard the Yellow Line BRT corruption case after authorities submitted a…

June 23, 2026
Pakistan

Khawaja Asif Rawalakot Remarks Draw PPP, JUI-F Criticism in NA

Khawaja Asif Rawalakot's remarks drew criticism from Pakistan Peoples Party Chairman Bilawal Bhutto Zardari and Jamiat…

June 25, 2026
Azad Jammu Kashmir

Amjad Ali Khan Quits JAAC, Urges AJK Youth To Avoid Unrest

Azad Kashmir: Advocate Raja Amjad Ali Khan has announced his disassociation from the Joint Awami Action…

June 21, 2026
PhotoNews Pakistan

Always Stay Up to Date

Subscribe to our newsletter to get our newest articles instantly!

    Categories

    • World
    • Pakistan
    • Punjab
    • Sindh
    • Khyber Pakhtunkhwa
    • Balochistan
    • Azad Jammu Kashmir

     

    • Top News
    • Business
    • Entertainment
    • Sports
    • Videos
    • Tech
    • Offbeat
    • Blog
    • About Us
    • Privacy Policy
    • Code of Ethics & Editorial Standards

    © 2026 Phototnews
    All Rights Reserved.

    Welcome Back!

    Sign in to your account

    Lost your password?